Jebel
Ali 'G'
Station
- U.A.E.
PROJECT
PROFILE
Client:
Dubai
Electricity
& Water
Engineer:
Mott
Ewbank
Preece
Site:
Jebel
Ali 'G'
Station
- U.A.E.
Cumberland
were
commissioned
to
design,
build
and
install,
a
triplex
skid
mounted electrochlorination
system
including
electrolyser
skids,
transformer
rectifiers,
controls,
dosing
systems,
hypochlorite
storage
tank,
degassing
fans,
instrumentation
and
interconnecting
pipework.
The
system
is
designed
and
manufactured
to
produce
three
streams
each
with a
capacity
of 5.9
kg/hr.
Ras
Abu
Fontas -
Qatar
PROJECT
PROFILE
Client:
Ministry
of
Electricty
& Water
Engineer:
M.E.W.
Site:
Ras Abu
Fontas -
Qatar
Cumberland
were
commissioned
to carry
out a
complete
refurbishment
of an
existing
system
at Ras
Abu
Fontas
including
controls,
dosing
systems,
hypochlorite
storage
tank,
degassing
fans,
instrumentation
and
interconnecting
pipework.
Designed
and
manufactured
to
produce
four (4)
streams
each
with a
capacity
of 40
kg/hr,
(total
installed
capacity
160
kg/hr).
 |
 |
 |
 |